KPMG
Architectural-grade fabrication and cladding delivered to enterprise tolerance.


A high-spec corporate fit-out for KPMG at Canary Wharf. Fabricated metalwork and architectural cladding, delivered inspection-ready — with installation handled by the main contractor.
Challenge
The brief called for a bespoke LED framework mounted to a reception, integrating an existing stainless steel handrail — formerly a glass-panelled balcony — into a high-spec, L-shaped LED fit-out. The metalwork and cladding had to be fabricated to fine tolerances with a flawless visible finish, in a live commercial building.
Solution
Westlind designed and fabricated a bespoke LED framework built around the existing structure, integrating the retained stainless steel handrail into a clean, L-shaped installation. Metalwork and cladding were produced to fine tolerances for a flawless visible finish, with works carried out to keep the live commercial building running throughout.
Canary Wharf — LED Build





Result
A high-spec, L-shaped LED installation with the existing stainless steel handrail seamlessly integrated. Bespoke metalwork and cladding to fine tolerances, a flawless visible finish.