OVO Hydro
Critical structural intervention delivered inside a live venue window.


A rapid-response engineering deployment at the OVO Hydro arena. Concept to installed solution in 72 hours — with zero impact on the venue's published event schedule.
Challenge
A critical structural intervention required at a major UK arena ahead of a live event window. No room for engineering iteration on site, and no tolerance for slipping the published schedule.
Solution
Rapid site survey, on-the-fly engineering and in-house fabrication, delivered and installed under live operational constraints. Decisions made and acted on inside hours, not days.
The OVO Hydro — LED Build



Result
Solution in place ahead of the event, with no impact to the venue's published schedule and no remediation required post-event.
Have a projectothers can't solve?Let's build it.
Tell us what you're building — we'll engineer the solution. From concept to installation, delivered in-house.