Infrastructure/Glasgow

OVO Hydro

Critical structural intervention delivered inside a live venue window.

OVO Hydro logo
Live Venue
The OVO Hydro arena — exterior view of the venue with installed LED entry banners
REF · OVO-001 — Venue facade, integrated LED entry signage
Overview

A rapid-response engineering deployment at the OVO Hydro arena. Concept to installed solution in 72 hours — with zero impact on the venue's published event schedule.

Challenge // 01WL · 01

Challenge

A critical structural intervention required at a major UK arena ahead of a live event window. No room for engineering iteration on site, and no tolerance for slipping the published schedule.

Solution // 02WL · 02

Solution

Rapid site survey, on-the-fly engineering and in-house fabrication, delivered and installed under live operational constraints. Decisions made and acted on inside hours, not days.

Project Gallery

The OVO Hydro — LED Build

Glasgow · Live Venue Environment
Structural · LED · Wayfinding
The OVO Hydro — full-length LED wayfinding banner above general entry concourse
REF · OVO-002 — General Entry, full-length LED wayfinding ribbon
The OVO Hydro — angled view of LED ribbon detail, suspended structural mounting
REF · OVO-003 — Suspended LED detail, structural mounting
The OVO Hydro — wide exterior view showing LED ribbon integration with venue architecture
REF · OVO-004 — Venue context, architectural integration at scale
Result // 03WL · 03

Result

Solution in place ahead of the event, with no impact to the venue's published schedule and no remediation required post-event.