Corporate/London

Third Space

Luxury fit-out integrated with engineered aluminium componentry.

Luxury Wellness Build
Third Space — finished 25m luxury pool with stone-clad columns, recessed lighting and engineered aluminium handrails, in operational service
REF · SPA-001 — Finished pool hall, in operational service
Overview

Bespoke aluminium components delivered for a high-end Third Space spa. Engineered to integrate seamlessly with luxury finishes and complex MEP systems.

Challenge // 01WL · 01

Challenge

A high-end spa requiring unique fabricated features to integrate with luxury finishes and complex MEP systems — with no tolerance for visible defects or post-install rework.

Solution // 02WL · 02

Solution

Custom-fabricated aluminium components, finished to spec, coordinated with site trades and sequenced into the wider fit-out programme.

Build Sequence

Shell to Finished Spa

London · Private Members' Spa
Engineered Substructure · Luxury Finish
Spa — pool tank mid-fit-out with engineered MEP services, acoustic ductwork and waterproof substrate prepared for stone cladding
REF · SPA-002 — Pool tank, services first-fix complete
Spa — engineered access stair into below-pool plant void with galvanised tread system and edge-protection handrails
REF · SPA-003 — Plant void access, galvanised tread system
Spa — adjacent treatment hall during fit-out, with co-ordinated structural openings and protected substrate ready for finishing trades
REF · SPA-004 — Adjacent hall, structural openings co-ordinated
Spa — engineered tubular handrail and edge-protection system around plant void, fabricated and installed by Westlind
REF · SPA-005 — Tubular edge-protection system, install complete
Third Space — paint-finished aluminium structural columns and beams installed above the pool tank during fit-out
REF · TS-006 — Painted aluminium columns, pool-side install
Third Space — protective wrap on aluminium columns and primary beams during adjacent stone and panel fit-out works
REF · TS-007 — Protected aluminium frame, fit-out underway
Third Space — close-up of aluminium bracket and beam connection detail tying frame back to the concrete substrate
REF · TS-008 — Aluminium bracket and beam connection
Result // 03WL · 03

Result

Seamless integration into the finished space. Zero remediation post-install and a finished result aligned with the brand's luxury standard.

Contact Westlind

Have a projectothers can't solve?Let's build it.

Tell us what you're building — we'll engineer the solution. From concept to installation, delivered in-house.